Friday, 30 May 2014

Much too much

Aside from the fun stuff in the photos, here is a list of other stuff that needs to get done, is being done, or hasn't been started yet, and there is a lot of it...


  • Connection to water supply, but not to mains sewerage as we are using a bio-digester (clicky) which is a clever contraption that means we treat our own waste and turn it into something close to freshwater that is deposited out into the trees
  • Electric supply
  • Gas supply
  • Register with the council so we can have a house number or name
  • Think of a house name
  • Register with the post office so we can get post delivered
  • Get a BT line installed
  • Confirm the kitchen design
  • Choosing floor tile.  Although we think we have the tiles for the main living space, it currently resides on the floor of one of the rooms in the house we are renting.  Its a bit of an accident waiting to happen
  • Complete the mortgage


There is probably other stuff, but at the moment we are trying to get a grip on that list as the building is, or will be soon, dependent on it.